3 New Notifications

New Badge Earned
Get 1K upvotes on your post
Life choices of my cat
Earned 210

Drag Images here or Browse from your computer.

Trending Posts
Sorted by Newest First

Shumka. Beginning… — Toyota Corolla Levin, 1.6 liter, 1999

While the repairman was unwell and the fit and installation of the bumper hung up, he finally decided to do the Shumkov. Summer is coming to an end, you have to keep up.
On Saturday, the sutra bought materials, got to the garage and started. The remaining half of Saturday for work was spent mostly on disassembly

  Toyota Corolla Levin 16 1999   Toyota Corolla Levin 16 1999


at the end of which he managed to roll up only 1 small section of the floor with a bimast

  Toyota Corolla Levin 16 1999


I tore off the regular Shumka, where it was peeling off ...
On Sunday, things went faster, but the weather soon deteriorated, the sun hid, and again I had to heat the bimast with a hairdryer before gluing. As a result, the entire floor to the rear sofa is rolled up with bimast

  Toyota Corolla Levin 16 1999   Toyota Corolla Levin 16 1999   Toyota Corolla Levin 16 1999


While on the vibra, I stopped there, I decided to first make a full sound of what lies under the carpet, so that I could lay the carpet, assemble the panel and put 1 chair, and not mount it, dismantle it daily, and then deal with the back part. I started to glue a layer of twiplen, but, unfortunately, I managed to do a little, about half, and actually, this is how I drive now :)

  Toyota Corolla Levin 16 1999   Toyota Corolla Levin 16 1999


Until the weekend, if the weather calls, after work I will continue little by little. Hope to finish next weekend...

214 Comments
Sort by:
t
tosiro 21.01.22

I, too, have been planning everything since spring, but I couldn’t decide in any way ... and then it’s up to winter, soon it will be a loud (very loud!) Amtel change of shoes ... I can’t stand the second winter under a rumble comparable to a Boeing)

O
Olegik 21.01.22

Tower!
For the fact that my hands are taken at all - I can’t set myself up for this, well, I can’t :)

A
AHTOH-KATOCIMOTO 21.01.22

Noise is a good thing! I did it myself, the difference is palpable!

a
apache 21.01.22

right now you will gain experience, then you will do it in 2 days))

t
tosiro 21.01.22

xs) people write how wonderfully they manage to do everything in 2 days, and in two days I did no more than 30-40% of the work) with twip it is much easier than with bimast, soft, it bends and rolls easily, but there is still a lot to glue with bimast) and the places are more difficult than the floor in front) in general, I’m still afraid to even think about how I will glue further with a bimast)
and by the way, it’s not in vain that special offices sell narrow rollers with a metal head for 500r, I didn’t think in advance - due to the mass, it would be many times simpler…

a
apache 21.01.22

do it quickly, you were going more)