The creation of a water treatment plant (Fallout 4)
In General put it as close to the generator and should be connected with the cable,but it's impossible to do because the cable is red.What you need to do to install make?4 Comments
S
SanKram
08.05.20
Put support or more and pull.By the way the generator what? I want to put the most powerful,probably the skills is not enough...
G
Gerrarrd
08.05.20
1SanKram1
Thanks,turned,and about the most powerful Yes you need a skill science of the 1st level,I advise you to pump you'll need that on the instructions of the capture of the Fort there need to be the biggest generator